Our Projects

Our business-led approach ensures a performance-driven, motivated, professional workforce supported by end-to-end business processes and a system that creates a knowledge-based culture within the organization. Today, we are winning through our people - making customer satisfaction a reality - and securing long-term business in future. Through leadership direction, and the diversity of skills and expertise of our people and association, we have a vision to place ourselves as a distinct market-leader as a provider of world-class services.

Saudi Aramco Rastanura

Client   : HUTA

Sector   : Oil & Gas

Location   : Rastanura

Project Title : UPGRADE WEST PIER FACILITIES

Duration   : 18 Months
[March 2019 To Sept. 2020]

 

 

 

 

 

Scope of Works
I.HVAC WorksII.Fire Fighting WorksIII.Static and Rotating Equipment Installationa)Pumps – 12 EA
b)Tank – 1 EAIV.Piping Worksa)Fabrication & Field Installationi.Fabrication & Field Welding – 17,310 IDii.Erection – 1,320 LM
Sand Blasting & Painting
FBE Coating – 1,400 LM
Piping – 2,168 M²
c) NDT & Hydro TestElectrical Works
Cable Pulling – 57,223 LM
Anode Installation – 72 EA
Switch Rack Installation – 3 EA
Transformers – 8 EA
Control & Instrumentation Works
Tele-Communication Works
Pre-Commissioning Works

Saudi Aramco Uthmaniyah

Client  : ENGINEERING FOR THE PETROLEUM & PROCESS INDUSTRIES [ENPPI]

Sector  : Oil & Gas

Location  : UTHMANIYAH

Project Title : REPLACEMENT & SEGREGATION                    OF KHUFF GAS PIPING

Duration  : 10 Months [July 2019 to April 2020]

 

 

 

 

 

 

 

 

 

Scope of Works

I.Civil works, Including Excavation, Foundations Works.

II.Structural Works

a)Structural Installation – 127 Tons

b)Support Installation – 33 Tons
III  Piping Works (Cladded Piping)

a)Fabrication & Field Installation

i.Shop – 23,295 ID

ii.Field – 7,942 ID

iii.Erection – 4,339 LM

b)Sand Blasting & Painting – 5,776 M²

c)NDT & Hydro Test

d)Insulation & Cladding – 3,183 M²

  1. Electrical Works

VI.Control & Instrumentation Works

VII.Pre-commissioning and Commissioning works.

Saudi Aramco Safaniyah & Shaybah

Saudi Aramco Safaniyah

Client  : ENGINEERING FOR THE PETROLEUM   & PROCESS INDUSTRIES [ENPPI]

Sector  : Oil & Gas

Location  : SAFANIYAH

Project Title : WATER DISPOSAL SYSTEM  REFURBISHMENT

Duration  : 24 Months [May 2019 to April 2021]

Scope of Works
I.Civil works, Including Excavation, Foundations works – 19,532 M³

II.Structural Works

a)Support Installation – 32 Tons

III.Piping Works

a)Fabrication & Field Installation – 49,188 ID

b)Sand Blasting & Painting

c)NDT & Hydro Test.

IV.Pre-commissioning and Commissioning works.

Saudi Aramco Shaybah

Client  : SAUDI ARAMCO

Sector  : Oil & Gas

Location  : SHAYBAH NGL

Duration  : 9 Months [August 2019 to April 2020]

Scope of Works

I.Structural Works

II.Equipment Works

a)Demolition & Installation of 4 Air Coolers – 240 Tons

III.Piping Works

a)Fabrication & Field Installation

b)Painting

c)NDT & Hydro Test.

IV.Pre-commissioning and Commissioning works.

 

 

Sl. NO

CLIENT NAME

END USER NAME

LOCATION

SCOPE OF SERVICES

1

SAUDI ARAMCO

SAUDI ARAMCO

YANBU REFINERY

TANK REPAIR AND PAINTING SERVICES

2

SAUDI ARAMCO

SAUDI ARAMCO

YANBU REFINERY

TANK CONSTRUCTION AND TANK REPAIR SERVICES

3

SAUDI ARAMCO

SAUDI ARAMCO

YANBU REFINERY

PIPING FABRICATION, INSTALLATION AND PAINTING SERVICES

4

SAUDI ARAMCO

SAUDI ARAMCO

YANBU REFINERY

CATALYST REMOVAL & RELOADING OF VESSELS

5

SAUDI ARAMCO

SAUDI ARAMCO

YANBU NGL

CHEMICAL INJECTION PUMP REPLACEMENT WITH STAINLESS STEEL PIPING WORKS

6

SAUDI ARAMCO

SAUDI ARAMCO

JEDDAH REFINERY

TANK REPAIR SERVICES

7

SAUDI ARAMCO

SAUDI ARAMCO

TABUK REFINERY

TRS 2013 REMOVAL & CLEANING OF FABRICATED TRAYS IN TOWERS

8

SAUDI ARAMCO

SAUDI ARAMCO

JEDDAH REFINERY

  1. REMOVAL OF MANUAL OPERATED FIRE WATER PUMPS
  2. PIPING AND SUPPORTS FOUNDATIONS
  3. INSTALLATION OF NEW PUMP FOUNDATION, NEW PUMPS & ITS ASSOCIATED MECH,ELEC & STRU WORKS

9

SAUDI ARAMCO

SAUDI ARAMCO

JEDDAH REFINERY

PARTIAL REPLACEMENT OF FCCU RISER AND HEX STEEL REPLACEMENT

10

SAUDI ARAMCO

SAUDI ARAMCO

JEDDAH REFINERY

PARTIAL RETUBING OF MSF EVAPORATOR [3,988 TUBES]

11

SAUDI ARAMCO

SAUDI ARAMCO

JEDDAH REFINERY

REMOVE AND REPLACE REGENERATOR CYCLONE AT FCCU

12

SAMREF

SAMREF

YANBU

  1. REMOVAL OF CAUSTIC INCINERATOR
  2. MECHANICAL REPAIRS
  3. RE-INSTALLATION OF THE UNIT AT THE REFINERY
  4. FABRICATION OF REPLACEMENT BURNERS

13

UNITED SUGAR CO LTD [SAVOLA GROUP]

UNITED SUGAR CO LTD [SAVOLA GROUP]

YANBU

  1. FABRICATION AND INSTALLATION OF STAINLESS STEEL FAN HEADERS
  2. REMOVAL & REPLACEMENT OF PIPING, PUMPS,GEAR BOXES, HOPPERS
  3. BOILER REPAIR
  4. REPLACEMENT OF 28” STAINLESS STEEL VAPOR LINE

14

TECNICAS REUNIDAS

YASREF

YANBU

FABRICATION AND INSTALLATION OF COKER PLANT FURNACE PIPING

15

GAMA MUSHAIGA

SHOIABAH POWER PLANT

YANBU

  1. ERECTION OF DESALINATION UNITS
  2. FABRICATION & ERECTION OF SS & CS

16

TEKFEN

SADARA

JUBAIL

FIELD INSTALLATION OF PIPING FOR PROPYLENE OXIDE PLANT [42,000 LM]

17

SETE ENERGY

MARAFIQ

YANBU

PRE FABRICATION, FABRICATION, INSTALLATION, HYDRO TESTING & FLUSHING OF NON METALLIC PIPING FOR 48,000 M3/DAY INDUSTRIAL WASTE WATER TREATMENT PLANT  [IWWTP-II] AT MARAFIQ YANBU

18

ENPPI

SAUDI ARAMCO

SAFANIYAH

  1. CIVIL WORKS
  2. PRE-FABRICATION, INSTALLATION, PAINTING, INSULATION & PRE-COMMISSIONING OF 45,000 DI PIPING

19

TARGET

SAUDI ARAMCO

UTHMANIYAH & SHEDGUM

  1. CIVIL WORKS
  2. PRE-FABRICATION, INSTALLATION, PAINTING, INSULATION & PRE-COMMISSIONING OF 30,000 DI PIPING